Cookies help us deliver our services. By using our services, you agree to our use of cookies. More information

Development MitoFit proficiency test

From Bioblast
Revision as of 20:08, 21 February 2016 by Laner Verena (talk | contribs)


MitoFit Preprints         MitoFit Preprints        
Gnaiger 2019 MitoFit Preprints
       
Gnaiger MitoFit Preprints 2020.4
        MitoFit DOI Data Center         MitoPedia: Preprints         Bioenergetics Communications


Development MitoFit proficiency test

The project MitoFit highlights the benefits of mitochondrial fitness.


Development of the MitoFit proficiency test

Abstract
A proficiency test is an essential part of a quality control system designed to minimize experimental error in diagnostic tests. Instrumental errors can be detected by routine calibration and instrumental performance tests (instrumental background) and avoided by technical service before conducting a diagnostic test, should instrumental validation indicate a problem in advance of an experiment (WP3). In addition, reference samples with properties relevant for the diagnostic assay (WP4) are analysed at different time points during the longitudinal progress of a project or in the direct context of patient diagnostic assays, such that quantitative results are validated. The purpose of the proficiency test is also to help improve performance and to determine if the test methods in use are reliable and reproducible (Figure 6A). Interlaboratory ring testing of reference samples is known as an external quality control (Figure 6B). The need for such a proficiency testing scheme for respiratory OXPHOS analysis is frequently discussed in the literature, but no generally applicable solution is available yet. An interlaboratory comparison revealed disturbingly high variability of results with spectrophotometric (enzymatic) analysis of respiratory complex activities (Gellerich et al 2004). In contrast to respiratory OXPHOS analysis, enzyme kinetic OXPHOS assays are routinely performed on frozen samples. The interlaboratory MitoFit-PT will be developed and introduced in practice as a world-wide innovation in the field of mitochondrial respiratory physiology. A proficiency ring test is obligatory for certified laboratories.


Links
COST MITOEAGLE project